Churchill Park - Master Plan Phase 2 Online Information Session (Register here!)
Join Maureen as she hosts the folks from Landscape Architecture and Tys from the RBG in this online information session.
The City of Hamilton's Landscape Architectural Services section has started the design of Phase 2 of the Churchill Park Master Plan Implementation. In keeping with the approved Master Plan, the Phase 2 project will focus on drainage and pedestrian accessibility in the north end of the park.
- Installation of limestone screening walkways on the upper plateau (soccer field area) including formal connections to Royal Botanical Gardens (RBG) trailheads (Ginger Valley Trail and Princess Point Trail) and connections to phase 1 walkways. Re-grading of the existing cricket pitch area.
- Installation of grassed swales and small-scale rain gardens
- Shifting two mini soccer pitches east to permit small rain garden installation and improve sports field drainage.
- Installation of stone seating nodes at Franklin Ave and Norwood Road walkway intersections
Registration in advance is required for this meeting. Registration is required
WHEN
June 25, 2020 at 8:00pm - 9pm
WHERE
Online - Zoom; Registration in advance is required
CONTACT
Ward 1 Office
·
· 905-546-2416