Hello Strathcona and Kirkendall North neighbours,
The City has issued the following notice regarding upcoming construction on Main Street West: overnight work and some lane closures on Main Street West at
Project: Main St W, Watermain Lining - Contract C13-03-24(2026)
Dates: June 22-26, 2026 [Notice]
Work Hours: Mainly day work, some overnight, 7:00 PM – 7:00 AM [Weather permitting]
Water shutdowns may occur. Affected homes will receive notice.
Traffic is expected to be down to 1 LANE on Main Street West between 7:00 PM and 7:00 AM each night
To minimize impacts to daytime water use and rush-hour traffic, this work must be completed overnight. Please note that there will be increased noise during evening hours. Crews will make every effort to complete the work efficiently and reduce disruption where possible.
Need Earplugs?
If you require earplugs, please contact the Ward 1 Office, and we will arrange delivery.
📧 [email protected]
📞 905-546-2416
UPCOMING WORK
📍June 22-29, 2026, between 12:00 PM and 12:00 AM
- Main Street West between Poulette Street and Ray Street South - Excavation work
- Main Street West between Ray Street South and Caroline Street South -Watermain Pipe Cleaning:
📍June 22-29, 2026, between 7:00 AM and 7:00 AM
- Main Street West between Dundurn Street South and Ray Street South - Bypass Disconnection and Removal
- Main Street West between Dundurn Street South and Ray Street South - Restoration (Concrete and Asphalt Works):
- Main Street West between Caroline Street South and MacNab Street South - Excavation
- Main Street West between Caroline Street South and Hess Street South - Watermain Pipe Cleaning
LANE CLOSURES
Road Closures/Lane Restrictions will be required as detailed below:
📍June 22-24, 2026, between 12:00 PM and 12:00 AM
-
Ray Street South and moving west towards Poulette Street -
- Short duration, rolling side street closures
- When work progresses to Locke Street South, local access for residents from Nelson Street ONLY will be maintained. A Flag-Person will assist drivers in accessing their homes during the closure from Nelson Street (North side of the closure).
📍June 23-24, 2026 between 7:00 AM and 7:00 PM
-
Bay Street South
- Bike lanes closed at Main Street West intersection
- Cyclists are required to dismount and walk their bikes through the intersection
June 25-26, 2026, between 7:00 AM and 7:00 PM
-
Main Street West and Queen Street South
- Lane closures in the intersection
- Lane closures in the intersection
-
Hess Street closed at Main Street West intersection
- A Flag-Person will assist drivers in accessing the homes and businesses during the closure from George Street and Caroline Street South intersection.
- Vehicles will be directed along George Street by Flag-Person
Any additional information may be sought via the City of Hamilton's Construction Services Section.
- Construction Section: [email protected] or 905-546-4313
- On-site Inspectors: Ashley Borzellino, Brad Gresko, and Corrie Wilson
- Project Manager: Matt Spoletti
- City Road Closures
Contractor: Fer-Pal 24-hour emergency number 1-855-530-8592
Completed Work
📍 May 5 (7:00 PM) – May 6 (7:00 AM)
- Main St W & Dundurn St S Intersection [Notice] | Lane restrictions in effect
📍 May 6 (7:00 PM) – May 7 (7:00 AM)
- Main St W (Margaret St to Locke St S) + Margaret St intersection [Notice] | No access to Margaret St from Main St W. Local access via King St W only. Water shutdowns may occur (affected homes will receive notice)
📍 May 7 (7:00 PM) – May 8 (7:00 AM)
- Locke St S (Main St W to Nelson St) [Notice] | No northbound access to Locke St S from Main St W . Local access via Nelson St only. Water shutdowns may occur (affected homes will receive notice)
📍 May 8 (7:00 PM) – May 9 (7:00 AM)
- Locke St S (Main St W to Jackson St W) [Notice] | No southbound access to Locke St S from Main St W. Local access via Jackson St W only. Water shutdowns may occur (affected homes will receive notice)
📍 May 8 (7:00 PM) – May 9 (7:00 AM)
- Locke St S (Main St W to Jackson St W) [Notice] | There will be no southbound access to Locke St S from Main St W. Local access will be via Jackson St W only.
📍 May 11 (7:00 PM) – May 12 (7:00 AM)
- Main St W and Queen St S intersection [Notice] | Lane restrictions through the intersection. Excavation work
- Main St W (Dundurn St S to Poulette St) | Water main pipe cleaning works
📍 May 12 (7:00 PM) – May 13 (7:00 AM)
- Main St W and Bay St S intersection [Notice] | Excavation works in the intersection. Lane restrictions through the intersection
- Main St W (Poulette St to Locke St S)| Water main pipe cleaning works
📍 May 13 (7:00 PM) – May 14 (7:00 AM)
- Main St W (Hess St S to Caroline St S) [Notice] | Excavation works
- Main St W and Strathcona Ave S intersection + Main St W and New St intersection | Water main pipe cleaning works
- Main St W (Dundurn St S to Poulette St) | CCTV works
📍 May 14 (7:00 PM) – May 15 (7:00 AM)
- Main St W and Pearl St S intersection [Notice] | Pearl St S CLOSED between Main St W and Nelson St. Lane restrictions through the intersection. Excavation work
- Main St W and Locke St S intersection | Locke St S CLOSED between Main St W and Nelson St. Water main pipe cleaning works
- Main St W and Margaret St intersection | Water main pipe cleaning works
- Main St W (Poulette St to Locke St S) | CCTV works
📍 May 15 (7:00 PM) – May 16 (7:00 AM)
- Main St W and Strathcona Ave S intersection, Main St W and New St intersection | CCTV works
- Main St W (Locke St S to Pearl St S) | Water main pipe cleaning works
📍 May 19 (9:00 AM - 3:00 PM)
- Locke St S CLOSED between Main St W and Nelson St [NOTICE] Lane closed for one block from 9 AM to 3 PM. Sidewalks open, cyclists must dismount and walk their bikes 55 m to the intersection, and vehicles are rerouted to Pearl St S.
📍 May 19-22, 25-29 | Overnight (7:00 PM – 7:00 AM) [NOTICE]
📍 Main St W between Dundurn St S and Hess St S NOTICE May 25-29
- Watermain Pipe Cleaning and CCTV Operations: Dundurn St S to MacNab St S
📍 Main St W between Dundurn St S and Poulette St NOTICE May 25-29
- Excavation work: Dundurn Street South, Strathcona Avenue South, and Poulette Street
📍 May 22 (7:PM AM - 7:00 AM)
Locke St S CLOSED between Main St W and Nelson St [NOTICE May 18-22] Lane closed for one block, Main to Nelson. Sidewalks open, cyclists must dismount and walk their bikes 55 m to the intersection, and vehicles are rerouted to Pearl St S.
Ray S S between Main St W and George St. Road closure for one block
📍 May 25 (7:00 PM AM - 7:00 AM)
Pearl St S CLOSED at the intersection with Main St W Lane closed for one block, Main to Nelson. Sidewalks open [NOTICE May 25-29]
📍 May 26-29 Night Work (7:00 PM AM - 7:00 AM)
Ray St S CLOSED between Main St W and George St. Lane closed for one block, Main to Nelson. Sidewalks open [NOTICE May 25-29]
📍 June 1 to 5, 2026 | Overnight (7:00 PM – 7:00 AM) [NOTICE]
Main St W between Dundurn St S and Hess St S - Watermain Pipe Cleaning and CCTV Operations: Dundurn St S to MacNab St S
Main St W between Dundurn St S and Poulette St - Excavation work: Dundurn Street South, Strathcona Avenue South, and Poulette Street
Lane Closures
📍 June 1-3 (12:00 PM - 12:00 AM) [NOTICE June 1-5]
Main Street West between Dundurn Street South and Poulette Street for Watermain Commissioning
📍 June 2 (7:00 PM AM - 7:00 AM)
Ray St S and Main St W intersection
- CCTV operations
Queen St S and Main St W intersection
- Excavation Works at the intersection of Main Street West and Queen Street South
- Northbound and Southbound traffic is reduced to one lane each through the intersection
📍 June 4-5 (12:00 PM - 12:00 AM Daily) [NOTICE]
Excavation Works at the intersection
- Locke St S and Main St W intersection
- Margaret St and Main St W intersection
- Pearl St S and Main St W intersection
📍 June 8 to 12, 2026 | [NOTICE]
Overnight (7:00 PM – 7:00 AM)
-
Main St W between Ray St S and MacNab St S
- Watermain Pipe Cleaning and CCTV Operations
Daytime (12:00 PM to 12:00 AM)
-
Main St W between Poulette St and Hess St S
- Excavation work
-
Main St W between Queen St S and MacNab St S
- Watermain Commissioning:
📍 June 15 to 19, 2026, 12:00 PM to 12:00 AM | [Notice]
- Main Street West between Dundurn Street South and Locke Street South - for excavation work
- Main Street West between Ray Street South and Caroline Street South - for watermain commissioning
📍 June 15 to 19, 2026, 7:00 AM to 7:00 PM | [Notice]
- Main Street West between Hess Street South and MacNab Street South - for CCTV Operations:
Road Closures will be required as detailed below:
📍June 15, between 12:00 PM and 12:00 AM
-
Locke Street South closed at Main Street West.
- Local access for residents will be maintained ONLY from Nelson Street.
- A Flag-Person will assist drivers in accessing their homes during the closure from Nelson Street (North side of the closure).
📍 June 16, between 7:00 AM and 7:00 PM
-
Hess Street South is closed at Main Street West
- Local access will be maintained for residents and businesses at the intersection of Caroline Street South and George Street ONLY.
- A Flag-Person will assist drivers in accessing the homes and businesses during the closure from the George Street and Caroline Street South intersection.
- Vehicles will be directed along George Street by a flag person on
📍 June 18, between 12:00 PM and 12:00 AM
- Lane restrictions at the Hess Street South and Main Street West intersection
📍 Friday, June 19, between 7:00 AM and 7:00 PM
- Lane restrictions at the Queen Street South and Main Street West intersection
- Ray Street South is closed at Main Street West